6/4/09: The bath/dark room is coming along well. The Drywall is up and the plumbing and electrical are finished. I also installed a concrete countertop and oversized sink. It should do its job. Hopefully not too much more work to get it up and running as a darkroom.
4/15/09: Tapped into the cast iron waste stack in the house to install a sink for the bath/darkroom last night. Looks like it will work out. The lights are installed and the walls are framed. Now only drywall, a sink, toilet, countertops, and paint remain - plus the darkroom equipment. |